WEBVTT

NOTE IDER in-house training materials. Captions follow measured phrase audio timings.
Hypothetical worked cases; figures are instructional examples.

00:00:00.000 --> 00:00:05.956
Imagine you advise a cold-chain operator considering a
new city. Management wants a market size, but a large

00:00:05.956 --> 00:00:09.265
market does not tell us whether this operator should
enter.

00:00:09.385 --> 00:00:16.951
We need a decision with alternatives, a time horizon,
and a loss the organisation can tolerate. Throughout

00:00:16.951 --> 00:00:22.736
this clinic, every number describes a hypothetical
training case, not current market statistics.

00:00:22.856 --> 00:00:28.127
Our alternatives are immediate launch, a limited
pilot, and deferral.

00:00:28.247 --> 00:00:34.600
Notice that the research question changes when a pilot
is available: we ask which uncertainty could reverse

00:00:34.600 --> 00:00:40.205
the decision and how cheaply we can reduce it. Keep a
calculation sheet beside you.

00:00:40.325 --> 00:00:45.039
By the end, you will build a defensible recommendation
rather than a persuasive market story.

00:00:45.709 --> 00:00:52.848
Start a decision contract with the person who can
approve entry. Specify the city, customer segment,

00:00:52.848 --> 00:00:59.095
service standard, and first operating year. Then agree
gates before anyone sees favourable results.

00:00:59.215 --> 00:01:05.318
For example, paid orders must cover monthly operating
costs, available capacity must meet the promised

00:01:05.318 --> 00:01:08.573
service, and cash must fund the collection cycle.

00:01:08.693 --> 00:01:16.642
A gate is useful only when its definition is testable.
Saying demand must be strong leaves room for

00:01:16.642 --> 00:01:20.616
interpretation; specifying a contribution threshold
establishes a measurable requirement.

00:01:20.736 --> 00:01:26.863
Record which evidence could support, weaken, or
overturn each gate. This prevents the familiar problem

00:01:26.863 --> 00:01:29.723
of changing success criteria after the fieldwork.

00:01:29.843 --> 00:01:35.253
The contract should also name who resolves conflicting
commercial and operational evidence.

00:01:35.923 --> 00:01:42.101
Take eight hundred firms that genuinely need the
service. Sixty percent are reachable through the

00:01:42.101 --> 00:01:45.397
proposed sales route, leaving four hundred and eighty.

00:01:45.517 --> 00:01:51.856
If one quarter of those firms adopt and each places
four monthly orders, potential demand is four hundred

00:01:51.856 --> 00:01:52.912
and eighty orders.

00:01:53.032 --> 00:02:00.294
These percentages are conditional: adoption applies to
reachable firms, not to every firm in the city. That

00:02:00.294 --> 00:02:03.284
distinction prevents double counting and unjustified
optimism.

00:02:03.404 --> 00:02:09.649
Give each assumption a source, observation date, and
plausible range. A company registry may establish

00:02:09.649 --> 00:02:15.062
eligibility only after checking activity and product
fit. Interview interest cannot establish paid

00:02:15.062 --> 00:02:15.478
adoption.

00:02:15.598 --> 00:02:21.268
Trace the funnel backwards when a manager challenges
the result; you should be able to identify the

00:02:21.268 --> 00:02:22.936
specific assumption that drives disagreement.

00:02:23.606 --> 00:02:29.294
Design evidence collection around the funnel rather
than one general questionnaire. Verify eligibility

00:02:29.294 --> 00:02:34.982
against actual temperature-sensitive shipments. For
reach, test whether sales staff can contact decision

00:02:34.982 --> 00:02:37.607
makers at the proposed acquisition cost.

00:02:37.727 --> 00:02:43.880
For adoption, ask customers to make a real commitment
under clearly explained service and price terms.

00:02:43.880 --> 00:02:49.649
Separate first purchase from repeat use, because a
launch promotion can produce trial without durable

00:02:49.649 --> 00:02:50.034
demand.

00:02:50.154 --> 00:02:57.090
Sample across firm size, route and current supplier,
including businesses outside management's existing

00:02:57.090 --> 00:03:02.960
network. A convenient sample of enthusiastic contacts
usually overstates accessible demand.

00:03:03.080 --> 00:03:09.691
Keep refusal and nonresponse records so the reader can
assess selection. Interview explanations help reveal

00:03:09.691 --> 00:03:15.421
mechanisms, but do not convert a compelling quotation
into a numerical population estimate.

00:03:16.091 --> 00:03:19.249
Now turn market evidence into operating economics.

00:03:19.369 --> 00:03:26.798
Our hypothetical price is three hundred cedis and the
incremental cost per order is one hundred and eighty,

00:03:26.798 --> 00:03:31.339
so each order contributes one hundred and twenty
toward fixed costs.

00:03:31.459 --> 00:03:36.812
Divide monthly fixed costs of forty-eight thousand by
that contribution: operating break-even is four

00:03:36.812 --> 00:03:37.577
hundred orders.

00:03:37.697 --> 00:03:44.550
The denominator must include costs that actually
change with an extra order, such as route labour, fuel

00:03:44.550 --> 00:03:50.596
and packaging. If overtime begins above a capacity
threshold, one constant variable cost will mislead.

00:03:50.716 --> 00:03:57.074
This calculation also excludes initial investment,
financing and tax. A positive operating surplus

00:03:57.074 --> 00:04:03.921
therefore does not establish an acceptable investment
return. State that boundary explicitly before using

00:04:03.921 --> 00:04:06.366
break-even as an entry gate.

00:04:07.036 --> 00:04:13.400
Demand is not delivered volume. Suppose the operation
can reliably complete only four hundred and twenty

00:04:13.400 --> 00:04:16.185
monthly orders at the promised service standard.

00:04:16.305 --> 00:04:23.093
Revenue is then four hundred and twenty times three
hundred, or one hundred and twenty-six thousand cedis,

00:04:23.093 --> 00:04:25.488
rather than the unconstrained demand forecast.

00:04:25.608 --> 00:04:31.344
Calculate capacity at the bottleneck: refrigerated
vehicle hours, loading slots, or storage throughput.

00:04:31.344 --> 00:04:38.844
Average capacity can conceal peak-day failure, so test
the order pattern as well as the monthly total.

00:04:38.964 --> 00:04:45.703
Rejecting sixty orders may also affect customer
retention and future sales. Expansion might remove the

00:04:45.703 --> 00:04:49.297
bottleneck, but it introduces capital and staffing
costs.

00:04:49.417 --> 00:04:56.182
Put those costs into a separate option instead of
quietly assuming capacity grows for free when demand

00:04:56.182 --> 00:04:56.580
increases.

00:04:57.250 --> 00:05:03.458
Pause the video and change adoption from twenty-five
percent to twenty percent. Keep every other assumption

00:05:03.458 --> 00:05:09.278
unchanged: eight hundred eligible firms, sixty percent
reach, and four orders per adopter each month.

00:05:09.398 --> 00:05:15.957
First calculate potential orders. Next compare that
result with the capacity limit of four hundred and

00:05:15.957 --> 00:05:21.286
twenty, because revenue uses the lower number. Finally
calculate contribution less fixed costs.

00:05:21.406 --> 00:05:26.805
Write one sentence identifying whether demand or
capacity now constrains performance.

00:05:26.925 --> 00:05:32.863
Do not simply reduce the earlier surplus by five
percent; the adoption change is five percentage

00:05:32.863 --> 00:05:38.059
points, and the relationship passes through both the
demand funnel and a capacity ceiling.

00:05:38.179 --> 00:05:43.830
Show the intermediate calculations so another analyst
could reproduce your result without asking which

00:05:43.830 --> 00:05:45.041
figures you changed.

00:05:45.711 --> 00:05:52.912
The revised funnel produces three hundred and
eighty-four orders. That is below capacity, so all

00:05:52.912 --> 00:05:55.312
forecast demand can be served.

00:05:55.432 --> 00:06:01.876
Multiply by one hundred and twenty cedis contribution
and you obtain forty-six thousand and eighty. After

00:06:01.876 --> 00:06:08.319
forty-eight thousand fixed costs, the operation loses
one thousand nine hundred and twenty cedis per month.

00:06:08.439 --> 00:06:15.791
The important lesson is not the arithmetic alone. A
five percentage point change in adoption moves the

00:06:15.791 --> 00:06:20.548
business from capacity constrained to demand
constrained and crosses operating break-even.

00:06:20.668 --> 00:06:27.061
That makes paid adoption a priority research variable.
It does not mean every other uncertainty can be

00:06:27.061 --> 00:06:27.437
ignored.

00:06:27.557 --> 00:06:33.468
If delivery reliability affects repeat adoption,
demand and operational performance are linked, and the

00:06:33.468 --> 00:06:35.579
pilot must observe both together.

00:06:36.249 --> 00:06:42.105
Consider the capacity-limited base case with monthly
billed revenue of one hundred and twenty-six thousand

00:06:42.105 --> 00:06:42.496
cedis.

00:06:42.616 --> 00:06:48.134
Under a simplified steady billing assumption, an
additional thirty days before collection ties up

00:06:48.134 --> 00:06:51.288
approximately one extra month of revenue in
receivables.

00:06:51.408 --> 00:06:56.873
That is another one hundred and twenty-six thousand
cedis of funding, even if reported operating profit

00:06:56.873 --> 00:06:57.898
does not change.

00:06:58.018 --> 00:07:04.526
Build a monthly cash schedule including customer
deposits, supplier terms, payroll, taxes and opening

00:07:04.526 --> 00:07:10.569
inventory. The receivables shortcut is a screening
calculation, not a complete liquidity forecast.

00:07:10.689 --> 00:07:15.925
Seasonal sales and uneven payment dates can create a
much larger peak requirement.

00:07:16.045 --> 00:07:22.165
Entry should be conditional on funding that peak, with
room for delayed collections, rather than on an annual

00:07:22.165 --> 00:07:23.185
profit estimate alone.

00:07:23.855 --> 00:07:27.686
A useful sensitivity analysis locates switching
points.

00:07:27.806 --> 00:07:34.223
Holding reach and order frequency constant, break-even
adoption is four hundred divided by eight hundred

00:07:34.223 --> 00:07:38.928
times sixty percent times four: approximately twenty
point eight three percent.

00:07:39.048 --> 00:07:44.476
This tells the research team what precision matters.
Distinguishing twenty-one from twenty-five percent may

00:07:44.476 --> 00:07:47.965
matter more than measuring the total city population
perfectly.

00:07:48.085 --> 00:07:54.507
Then test coherent joint scenarios: weaker adoption
could coincide with higher acquisition costs or slower

00:07:54.507 --> 00:07:58.789
collections. Changing one assumption at a time misses
these interactions.

00:07:58.909 --> 00:08:05.050
Avoid assigning independent random distributions
simply because a spreadsheet can simulate them. Use

00:08:05.050 --> 00:08:07.884
observed relationships or clearly labelled scenarios.

00:08:08.004 --> 00:08:14.007
Report which uncertainties can be reduced with
evidence and which remain commercial risks even after

00:08:14.007 --> 00:08:14.807
careful research.

00:08:15.477 --> 00:08:21.665
A pilot should test the mechanism most capable of
changing the entry decision. Recruit across the

00:08:21.665 --> 00:08:27.080
intended customer segments, offer the planned
commercial terms, and track both first orders and

00:08:27.080 --> 00:08:27.853
repeat orders.

00:08:27.973 --> 00:08:33.755
Record acquisition effort, cancellations, delivery
failures and collections using linked customer

00:08:33.755 --> 00:08:41.638
identifiers. Set the observation period long enough to
reveal repeat behaviour, not just launch excitement.

00:08:41.758 --> 00:08:47.157
Before starting, define expansion, revision and
stopping rules using contribution and service

00:08:47.157 --> 00:08:54.355
performance. A small pilot may use unusually attentive
staff or spare vehicles; those conditions can make

00:08:54.355 --> 00:08:56.155
results difficult to scale.

00:08:56.275 --> 00:09:03.785
Document resources per order and recreate the proposed
operating model where feasible. The pilot is valuable

00:09:03.785 --> 00:09:09.417
because it resolves a decision, not because activity
alone demonstrates market interest.

00:09:10.087 --> 00:09:16.240
We can formalise whether more research is worth
buying. Consider a separate simplified decision with

00:09:16.240 --> 00:09:17.471
two possible states.

00:09:17.591 --> 00:09:24.413
Launch earns two hundred thousand cedis in the
favourable state, with probability sixty percent, and

00:09:24.413 --> 00:09:28.052
loses one hundred thousand otherwise. Deferral pays
zero.

00:09:28.172 --> 00:09:33.995
Without further information, the expected payoff from
launch is eighty thousand: one hundred and twenty

00:09:33.995 --> 00:09:37.878
thousand of probability-weighted gain less forty
thousand of probability-weighted loss.

00:09:37.998 --> 00:09:43.724
This is a risk-neutral calculation using hypothetical
probabilities and comparable payoffs. A

00:09:43.724 --> 00:09:49.928
cash-constrained organisation may rationally reject
that choice because the loss threatens survival. Keep

00:09:49.928 --> 00:09:51.837
the decision rule explicit.

00:09:51.957 --> 00:09:58.798
Information value also depends on whether management
can actually act on the finding before contracts,

00:09:58.798 --> 00:10:01.535
leases or other commitments become irreversible.

00:10:02.205 --> 00:10:08.295
Pause here and imagine a test that reveals the true
state perfectly before management decides. In the

00:10:08.295 --> 00:10:12.236
favourable state, management can launch and earn two
hundred thousand cedis.

00:10:12.356 --> 00:10:18.696
In the unfavourable state, it can defer and avoid the
hundred thousand loss. Calculate the expected payoff

00:10:18.696 --> 00:10:21.679
when the decision can depend on that information.

00:10:21.799 --> 00:10:27.900
Then subtract the best expected payoff available
without the test, which you calculated on the previous

00:10:27.900 --> 00:10:31.714
slide. The difference is the expected value of perfect
information.

00:10:31.834 --> 00:10:38.014
Explain why that figure cannot automatically become
the budget for a real customer survey. Real studies

00:10:38.014 --> 00:10:41.876
make mistakes, take time, and may not address every
uncertainty.

00:10:41.996 --> 00:10:46.455
Write your explanation alongside the numerical answer
before moving to the solution.

00:10:47.125 --> 00:10:52.504
With perfect information, launch occurs only in the
favourable state. Sixty percent times two hundred

00:10:52.504 --> 00:10:56.807
thousand gives an expected payoff of one hundred and
twenty thousand cedis.

00:10:56.927 --> 00:11:02.663
Subtract the current best expected payoff of eighty
thousand and perfect information is worth forty

00:11:02.663 --> 00:11:03.046
thousand.

00:11:03.166 --> 00:11:08.775
A real study will usually be worth less because its
signal is imperfect, and waiting can reduce

00:11:08.775 --> 00:11:09.435
opportunity value.

00:11:09.555 --> 00:11:16.286
This is an upper bound under the stated probabilities,
payoffs and risk-neutral rule, not a suggested

00:11:16.286 --> 00:11:16.707
invoice.

00:11:16.827 --> 00:11:24.548
To assess a real pilot, estimate how often each result
occurs, how it updates beliefs, and which action

00:11:24.548 --> 00:11:24.977
follows.

00:11:25.097 --> 00:11:31.590
Research that produces interesting detail without
changing the action may have little decision value

00:11:31.590 --> 00:11:33.445
despite excellent technical execution.

00:11:34.115 --> 00:11:39.521
Your final memorandum should fit the decision rather
than reproduce every research activity. State the

00:11:39.521 --> 00:11:42.764
recommended option and the conditions that would
change it.

00:11:42.884 --> 00:11:49.335
Show the demand funnel, constrained volume,
contribution, cash requirement and critical switching

00:11:49.335 --> 00:11:55.249
points. Link each important assumption to its
evidence, date and limitation.

00:11:55.369 --> 00:12:01.220
Distinguish measured facts, modelling choices and
management judgements so a reviewer knows where

00:12:01.220 --> 00:12:07.971
disagreement belongs. Include a short adverse case and
explain the operational response, not merely the

00:12:07.971 --> 00:12:08.871
financial result.

00:12:08.991 --> 00:12:15.415
Assign an owner to every unresolved gate and a date
for review. Avoid writing that the market is

00:12:15.415 --> 00:12:18.627
attractive when the evidence supports only a limited
pilot.

00:12:18.747 --> 00:12:23.357
The recommendation should be no stronger than the
weakest essential condition supporting it.

00:12:24.027 --> 00:12:29.958
Apply this method to one market study you already use.
Replace the headline market size with a customer

00:12:29.958 --> 00:12:32.595
funnel whose units and conditional rates are explicit.

00:12:32.715 --> 00:12:38.572
Recalculate attainable volume after capacity, then
test contribution and peak cash needs. Identify the

00:12:38.572 --> 00:12:44.429
assumption nearest its switching point and propose a
feasible observation that could improve it.

00:12:44.549 --> 00:12:50.435
For a junior practitioner, the immediate discipline is
reproducible calculation and a clear evidence trail.

00:12:50.555 --> 00:12:56.345
For a senior practitioner, the harder judgement is
deciding which uncertainty deserves resources and

00:12:56.345 --> 00:13:02.549
which must be accepted or transferred. Complete the
questions and applied tasks below the video.

00:13:02.669 --> 00:13:09.119
A strong answer explains the decision consequence of
each calculation and acknowledges the limits of the

00:13:09.119 --> 00:13:11.539
evidence, rather than reporting numbers alone.

