Hypothetical worked cases; figures are instructional examples.

00:00:00.000 --> 00:00:06.505
Imagine a service business comparing two urban
locations. One has stronger apparent demand; the other

00:00:06.505 --> 00:00:13.011
offers easier access and lower operating costs. The
practical question is not which location looks

00:00:13.011 --> 00:00:13.444
busiest.

00:00:13.564 --> 00:00:19.808
It is which location can support the intended service,
at an acceptable risk, under an explicit set of

00:00:19.808 --> 00:00:24.663
priorities. In this IDER in-house clinic, we will
build that decision from observable evidence.

00:00:24.783 --> 00:00:30.658
All locations and figures are hypothetical teaching
examples. Keep a spreadsheet nearby.

00:00:30.778 --> 00:00:37.197
You will calculate a ranking, discover when that
ranking reverses, and test whether the preferred

00:00:37.197 --> 00:00:39.764
option actually covers its operating costs.

00:00:39.884 --> 00:00:45.794
The final product is a recommendation another analyst
can reproduce and a manager can challenge.

00:00:46.464 --> 00:00:52.222
Start with conditions that a location must satisfy
before you compare its attractiveness.

00:00:52.342 --> 00:00:58.885
If the service requires reliable power and a site
cannot supply it at a feasible cost, an attractive

00:00:58.885 --> 00:01:01.793
demand score should not compensate for that failure.

00:01:01.913 --> 00:01:08.116
Write each gate as a test, with an evidence source and
an accountable reviewer. Then identify genuine

00:01:08.116 --> 00:01:09.575
trade-offs among eligible sites.

00:01:09.695 --> 00:01:16.674
A slightly longer journey may be acceptable if
customers obtain better service or lower prices. This

00:01:16.674 --> 00:01:22.344
separation prevents an impressive weighted average
from hiding a fatal constraint. Record exceptions

00:01:22.344 --> 00:01:22.780
explicitly.

00:01:22.900 --> 00:01:29.174
An unresolved permission issue belongs in a
conditional decision, not inside a quietly reduced

00:01:29.174 --> 00:01:31.863
score that executives might never notice.

00:01:32.533 --> 00:01:38.420
A circular radius on a map is convenient, but it
rarely describes the journey customers actually make.

00:01:38.420 --> 00:01:42.575
Build catchments using the transport modes and hours
relevant to your service.

00:01:42.695 --> 00:01:49.830
A road crossing, transfer or flooded route can change
effective access without changing physical distance.

00:01:49.830 --> 00:01:56.489
Sample customer origins and ask which alternative
destination they would use. This reveals overlapping

00:01:56.489 --> 00:01:57.916
catchments and substitution.

00:01:58.036 --> 00:02:04.175
Also define your unit carefully. The same commuter
passing twice is two observed visits, not necessarily

00:02:04.175 --> 00:02:06.476
two people or two purchase opportunities.

00:02:06.596 --> 00:02:12.476
For a practical study, maintain separate fields for
eligible visits, identifiable customers and completed

00:02:12.476 --> 00:02:18.355
purchases. That distinction will become essential when
we turn observed movement into a contribution

00:02:18.355 --> 00:02:18.775
forecast.

00:02:19.445 --> 00:02:25.339
Suppose your team counts Site A on a payday evening
and Site B on a quiet weekday morning. Precise

00:02:25.339 --> 00:02:27.201
counting will not repair that comparison.

00:02:27.321 --> 00:02:34.613
Create a schedule crossing the time periods and day
types that matter, then observe both sites within

00:02:34.613 --> 00:02:35.471
comparable strata.

00:02:35.591 --> 00:02:41.427
Expand each stratum using the number of similar
operating periods it represents, rather than

00:02:41.427 --> 00:02:44.345
multiplying one convenient hour across the month.

00:02:44.465 --> 00:02:49.519
Record unusual weather, promotions and closures so
that analysts can investigate anomalies. Repeated

00:02:49.519 --> 00:02:56.516
observations within one day may share the same shock,
so do not treat every minute as independent evidence.

00:02:56.636 --> 00:03:02.813
Before leaving the field, reconcile observer
definitions using a short joint counting exercise and

00:03:02.813 --> 00:03:03.695
review disagreements.

00:03:04.365 --> 00:03:11.752
Our illustration assigns each site a score for demand,
access and cost attractiveness. Higher always means

00:03:11.752 --> 00:03:18.216
better, including for cost, where a cheaper comparable
operating arrangement receives a higher score.

00:03:18.336 --> 00:03:25.266
The numbers are useful only after you define their
anchors. For example, specify what zero and one

00:03:25.266 --> 00:03:28.936
hundred mean and why intermediate performance deserves
its position.

00:03:29.056 --> 00:03:35.679
Otherwise two assessors may attach different meanings
to eighty. Avoid scoring the same benefit twice

00:03:35.679 --> 00:03:41.861
through correlated criteria such as footfall and
forecast sales unless the model explicitly separates

00:03:41.861 --> 00:03:42.744
their contributions.

00:03:42.864 --> 00:03:49.088
Keep the raw measurements alongside the converted
scores. When someone disputes the ranking, you can

00:03:49.088 --> 00:03:54.067
then distinguish a disagreement about observed
performance from a disagreement about priorities.

00:03:54.737 --> 00:04:03.062
We now apply demand, access and cost weights of fifty,
thirty and twenty percent. Site A receives forty

00:04:03.062 --> 00:04:08.611
points from demand, eighteen from access and eight
from cost, giving sixty-six.

00:04:08.731 --> 00:04:15.883
Site B receives thirty-two point five, twenty-five
point five and fifteen, giving seventy-three. These

00:04:15.883 --> 00:04:19.970
are preference scores, not probabilities of commercial
success.

00:04:20.090 --> 00:04:26.282
Elicit weights against the defined improvement from
the worst to the best performance on each scale.

00:04:26.282 --> 00:04:31.700
Asking which criterion sounds most important without
showing that range can create misleading weights.

00:04:31.820 --> 00:04:37.015
Record whose preferences the weights represent and
obtain their confirmation before revealing the final

00:04:37.015 --> 00:04:42.582
ranking. This reduces the temptation to adjust the
model until it endorses a favourite site.

00:04:43.252 --> 00:04:49.693
Pause the video and challenge the baseline. A decision
maker now proposes a seventy percent demand weight,

00:04:49.693 --> 00:04:54.618
while keeping the relationship between access and cost
weights at three to two.

00:04:54.738 --> 00:05:01.281
First calculate the new access and cost weights. Then
recompute both site scores without changing their

00:05:01.281 --> 00:05:02.099
underlying performance.

00:05:02.219 --> 00:05:08.771
Finally, write one sentence explaining whether a
changed ranking would indicate better evidence or

00:05:08.771 --> 00:05:09.707
different preferences.

00:05:09.827 --> 00:05:15.996
That final distinction matters in practice: a model
can change its recommendation even when no new

00:05:15.996 --> 00:05:21.008
observation has been collected. Show your intermediate
contributions rather than only the totals.

00:05:21.128 --> 00:05:27.345
If your weights do not add to one hundred percent,
correct the model before interpreting any resulting

00:05:27.345 --> 00:05:27.711
ranking.

00:05:28.381 --> 00:05:35.785
The remaining thirty percent divides into eighteen
percent for access and twelve percent for cost. Site A

00:05:35.785 --> 00:05:41.012
now scores seventy-one point six, while Site B scores
sixty-nine point eight.

00:05:41.132 --> 00:05:47.462
The ranking reverses because Site A's demand advantage
receives more influence. Nothing in this calculation

00:05:47.462 --> 00:05:53.791
proves that the original observations were wrong. You
have changed the decision maker's valuation of

00:05:53.791 --> 00:05:54.635
performance differences.

00:05:54.755 --> 00:06:01.744
In a committee discussion, show both scenarios and ask
whether the higher demand priority reflects the actual

00:06:01.744 --> 00:06:06.678
business strategy. Also check whether all participants
understood the same performance ranges.

00:06:06.798 --> 00:06:13.759
A useful sensitivity analysis reveals a consequential
disagreement; it does not average that disagreement

00:06:13.759 --> 00:06:18.234
away and present an artificial consensus as objective
measurement.

00:06:18.904 --> 00:06:25.173
Instead of trying isolated weights, solve for the
exact point where the two scores are equal. Let the

00:06:25.173 --> 00:06:26.567
demand weight be w.

00:06:26.687 --> 00:06:34.567
Access receives three fifths of the remainder and cost
two fifths. Site A's score becomes fifty-two plus

00:06:34.567 --> 00:06:39.666
twenty-eight times w. Site B's becomes eighty-one
minus sixteen times w.

00:06:39.786 --> 00:06:46.027
Equating them gives forty-four times w equal to
twenty-nine, so the switching point is approximately

00:06:46.027 --> 00:06:52.267
sixty-five point nine one percent. Below that value, B
ranks higher; above it, A does.

00:06:52.387 --> 00:06:58.059
This threshold is useful because decision makers can
assess a meaningful proposition: do we really value

00:06:58.059 --> 00:07:03.730
the defined demand improvement enough to allocate
roughly two thirds of the total weight to it?

00:07:04.400 --> 00:07:11.305
Weight sensitivity addresses preferences; it does not
capture uncertainty in measured demand. Treat those as

00:07:11.305 --> 00:07:12.225
separate layers.

00:07:12.345 --> 00:07:18.625
Revisit footfall estimates, conversion assumptions and
operating costs using defensible ranges linked to

00:07:18.625 --> 00:07:23.456
actual evidence quality. Then examine combinations
that can occur together.

00:07:23.576 --> 00:07:30.340
A road disruption may reduce visits and raise delivery
costs simultaneously, so independent one-variable

00:07:30.340 --> 00:07:36.620
changes could understate risk. Conversely, combining
every imaginable worst case without a coherent

00:07:36.620 --> 00:07:38.553
mechanism can exaggerate it.

00:07:38.673 --> 00:07:44.741
For repeated field observations, consider resampling
at the day or other relevant cluster level rather than

00:07:44.741 --> 00:07:45.500
individual counts.

00:07:45.620 --> 00:07:51.856
Report how often rankings change under the stated
scenarios, but do not call that a probability of

00:07:51.856 --> 00:07:54.791
success unless you have justified a probability model.

00:07:55.461 --> 00:08:01.480
Now move from relative attractiveness to absolute
viability. Assume twelve hundred eligible visits per

00:08:01.480 --> 00:08:07.929
day, a four percent purchase conversion and twenty-six
operating days. That gives twelve hundred and

00:08:07.929 --> 00:08:09.219
forty-eight monthly purchases.

00:08:09.339 --> 00:08:14.858
At thirty-five Ghana cedis contribution per purchase,
monthly contribution is forty-three thousand six

00:08:14.858 --> 00:08:21.649
hundred and eighty. Subtract fixed operating costs of
forty-two thousand and the surplus is only sixteen

00:08:21.649 --> 00:08:22.923
hundred and eighty.

00:08:23.043 --> 00:08:30.121
Contribution means selling price less the costs that
vary with the purchase; it is not sales revenue. This

00:08:30.121 --> 00:08:35.233
small surplus should immediately focus your evidence
collection on conversion and visit quality.

00:08:35.353 --> 00:08:43.485
It also excludes investment recovery, financing and
tax, so a positive result alone does not establish an

00:08:43.485 --> 00:08:44.920
acceptable investment return.

00:08:45.590 --> 00:08:51.487
A pilot is most valuable when it resolves a
decision-sensitive uncertainty. If the economic case

00:08:51.487 --> 00:08:56.991
depends on four percent conversion, simply collecting
more general footfall data may add little.

00:08:57.111 --> 00:09:04.062
Test the actual offer, opening hours and customer
journey at a comparable location or through a

00:09:04.062 --> 00:09:09.275
permitted temporary operation. Record the eligible
denominator before observing purchases and track

00:09:09.275 --> 00:09:10.579
repeat customers separately.

00:09:10.699 --> 00:09:17.767
Specify the duration and decision rule before seeing
results, including what would trigger redesign or

00:09:17.767 --> 00:09:18.709
further evidence.

00:09:18.829 --> 00:09:24.979
A short successful trial can still overstate normal
performance if novelty, discounts or exceptional

00:09:24.979 --> 00:09:26.736
staffing drove the outcome.

00:09:26.856 --> 00:09:32.986
Explain how the full operation would differ and adjust
the forecast using documented mechanisms, not a

00:09:32.986 --> 00:09:34.135
convenient unexplained haircut.

00:09:34.805 --> 00:09:41.129
Pause and calculate a combined downside. Daily
eligible visits fall by ten percent, and conversion

00:09:41.129 --> 00:09:47.453
falls to three point five percent. The operating
calendar, contribution per purchase and fixed costs

00:09:47.453 --> 00:09:48.296
stay unchanged.

00:09:48.416 --> 00:09:54.092
Calculate monthly contribution and the resulting
surplus or deficit. Then explain why subtracting ten

00:09:54.092 --> 00:09:58.552
percent from the original operating surplus would give
the wrong answer.

00:09:58.672 --> 00:10:05.318
The revenue-generating activity changes before fixed
costs are deducted, and conversion has changed as

00:10:05.318 --> 00:10:11.489
well. In your written recommendation, distinguish a
ranking conclusion from a viability conclusion.

00:10:11.609 --> 00:10:17.662
A site can remain the best of the compared locations
while all available options fail the business's

00:10:17.662 --> 00:10:22.290
minimum economic requirement. Deciding to defer is a
legitimate output of professional research.

00:10:22.960 --> 00:10:30.607
Ten percent fewer visits gives one thousand and eighty
per day. Multiplying by three point five percent

00:10:30.607 --> 00:10:36.004
conversion, twenty-six days and thirty-five cedis
contribution yields thirty-four thousand three hundred

00:10:36.004 --> 00:10:36.904
and ninety-eight.

00:10:37.024 --> 00:10:43.920
After fixed costs, the site loses seven thousand six
hundred and two cedis monthly in this scenario. Fixed

00:10:43.920 --> 00:10:48.901
commitments explain why the operating result
deteriorates much faster than the visit count.

00:10:49.021 --> 00:10:55.062
You should now investigate whether rent terms,
staffing patterns or the service offer can change

00:10:55.062 --> 00:10:59.493
without undermining demand. Recalculate the whole
mechanism after any proposed adjustment.

00:10:59.613 --> 00:11:05.921
A lower price may improve conversion while reducing
contribution per sale; treating that change as a pure

00:11:05.921 --> 00:11:08.889
demand benefit would repeat the same forecasting
error.

00:11:09.559 --> 00:11:14.552
Your decision memo should let a reviewer reconstruct
the recommendation without rebuilding the entire

00:11:14.552 --> 00:11:20.259
study. Show which sites passed the eligibility gates,
how the catchments were defined and when observations

00:11:20.259 --> 00:11:20.972
were collected.

00:11:21.092 --> 00:11:27.424
Present raw measures alongside scores, identify the
agreed weights and display the switching threshold.

00:11:27.424 --> 00:11:32.400
Then attach the operating model with baseline and
coherent downside cases.

00:11:32.520 --> 00:11:39.051
State a conditional recommendation in operational
language: proceed only if a specified uncertainty is

00:11:39.051 --> 00:11:45.581
resolved, an acceptable lease condition is obtained,
or a pilot meets the predefined requirement.

00:11:45.701 --> 00:11:52.826
Assign an owner and deadline to every condition.
Preserve the data version and calculation file so that

00:11:52.826 --> 00:11:58.693
the next update changes the evidence transparently
instead of silently rewriting the original decision.

00:11:59.363 --> 00:12:05.284
Before using this method in your next assignment,
audit one denominator and one scoring anchor.

00:12:05.404 --> 00:12:10.205
Ask whether your visits represent genuine purchase
opportunities and whether a ten-point score

00:12:10.205 --> 00:12:16.484
improvement means the same thing to every decision
maker. Then calculate both a ranking threshold and an

00:12:16.484 --> 00:12:17.223
economic threshold.

00:12:17.343 --> 00:12:24.479
The first tells you which option is preferred under
stated values; the second tells you whether an option

00:12:24.479 --> 00:12:28.047
is worth operating at all. Those are complementary
decisions.

00:12:28.167 --> 00:12:35.332
Complete the assessment below, then prepare the two
applied tasks using either the hypothetical case or a

00:12:35.332 --> 00:12:36.596
suitably anonymised project.

00:12:36.716 --> 00:12:42.177
Evaluate your work by traceability, coherent
assumptions and the clarity of the conditions attached

00:12:42.177 --> 00:12:46.468
to your recommendation, not by how confidently you
name a winner.